A tire factory you can run on a laptop
Argentina’s largest tire plant, with capacity for more than five million tires a year.
FATE Manufacturing
The problem
Policies, investments and changes had to be judged with numbers, in a plant where one tire goes through many interdependent processes.
What we built
A multi-method simulator, discrete event and agent based, covering 4 consecutive manufacturing sections, 16 machine types, conveyors, storage areas, vehicles and staff, with a 3D animation of the floor.
What they got
- Standalone simulator fed with data from the client’s own systems
- Production, loss and efficiency KPIs by machine, shift and product
- Bottleneck reports with their likely causes
What you can change in the model
Work schedules, bill of materials, staffing and task assignment, productivity per product and machine, efficiencies and random stops, storage areas, tool availability, machine setups, vehicle availability, initial stock and conveyor parameters.
What it reports
- Production, losses and efficiency, with the state of each machine over time
- Utilization and bottleneck alerts for storage, staff, movement equipment, tooling and conveyors
- Shift-by-shift staff utilization and absenteeism
- A 3D animation of the whole sector, to read the model at a glance
Methods behind it
- Simulation
- Discrete event simulation
- Agent-based modeling
- 3D animation
- Statistical analysis
Have a similar operation?
Tell us the decision you are unsure about. We will tell you if a model can help.