A tire factory you can run on a laptop

Argentina’s largest tire plant, with capacity for more than five million tires a year.

FATE Manufacturing

The problem

Policies, investments and changes had to be judged with numbers, in a plant where one tire goes through many interdependent processes.

What we built

A multi-method simulator, discrete event and agent based, covering 4 consecutive manufacturing sections, 16 machine types, conveyors, storage areas, vehicles and staff, with a 3D animation of the floor.

What they got

  • Standalone simulator fed with data from the client’s own systems
  • Production, loss and efficiency KPIs by machine, shift and product
  • Bottleneck reports with their likely causes

What you can change in the model

Work schedules, bill of materials, staffing and task assignment, productivity per product and machine, efficiencies and random stops, storage areas, tool availability, machine setups, vehicle availability, initial stock and conveyor parameters.

What it reports

  • Production, losses and efficiency, with the state of each machine over time
  • Utilization and bottleneck alerts for storage, staff, movement equipment, tooling and conveyors
  • Shift-by-shift staff utilization and absenteeism
  • A 3D animation of the whole sector, to read the model at a glance
The video loads from YouTube only when you press play.

Methods behind it

  • Simulation
  • Discrete event simulation
  • Agent-based modeling
  • 3D animation
  • Statistical analysis

Have a similar operation?

Tell us the decision you are unsure about. We will tell you if a model can help.

Book a free call
Chat on WhatsApp