Sand on site before the frac crew needs it

One of the main operators in Vaca Muerta, with more than 800 wells in production.

Tecpetrol Oil & gas

The problem

Fracturing sets stop when sand runs out. The logistics network needed the right number of assets: enough to never stop, no more.

What we built

An agent and discrete-event simulation of the sand supply chain, with parameter sweeps that evaluate many scenarios and find the best one.

What they got

  • Less non-productive time
  • Bottlenecks detected before they happen
  • A tool to compare new technologies and transport contracts
  • Optimal asset assignment

What the tool answers

  • What is the maximum production capacity of the current logistics network?
  • How should sand loading and unloading on the platforms be organized to cut cost without hurting service?
  • How many assets are enough to avoid non-productive time?

What it reports

  • Fracture stages per day
  • Sand stock in the area and supply from each deposit
  • Container movements from trucks to platforms
  • Asset utilization and the evolution of non-productive time
The video loads from YouTube only when you press play.

Methods behind it

Have a similar operation?

Tell us the decision you are unsure about. We will tell you if a model can help.

Book a free call
Chat on WhatsApp