From a manual schedule to an optimized one
A plant with cold-rolling, bending and welding machines working in sequence and in parallel.
Metal mesh manufacturer Manufacturing
The problem
Scheduling by hand ignored resource availability and workload. Productivity was low, stock was hard to project and the warehouse kept saturating.
What we built
An optimization engine using local search and Tabu Search, with an agent-based simulator that scores every candidate schedule.
What they got
- An optimized machine schedule
- Projected stock, demand fulfilment and utilization
- Workforce and transport needs known in advance
What goes in
Working and maintenance calendars, forecast demand, initial stock and machine configuration, bill of materials, products and routings, productivities, setups, required workforce and transport resources.
How it works
The optimizer starts from a base schedule built with predefined rules and explores neighbors with metaheuristics such as Tabu Search. The simulator scores each candidate and tells the optimizer which neighbors are worth trying next.
What it reports
Machine schedule, fulfilled demand, estimated production, utilization with a detail of losses, warehouse and transport use, required workforce, projected stock and supply needs. It also supports scenarios: current policies, the best scheduling strategy, and the policy that fits the plant best.
Methods behind it
- Simulation
- Optimization
- Local search
- Tabu Search
- Agent-based simulation
Have a similar operation?
Tell us the decision you are unsure about. We will tell you if a model can help.